Greenhouse construction, Phase one/ Notes from the meeting of December 3rd

At this meeting we got the frame of our Greenhouse put up. We bent inserted lengths of rebar into PVC pipe, and bent the rods into hoops, inserted about a foot into the ground. We then joined them at the top with another length of PVC/ rebar. The rebar provides the strength, and the PVC keeps the rebar from abrading the plastic cover. S30A0132

Due to the wind, which picked up towards the end of our meeting, we were unable to get the plastic cover attached. It would have been buried along the sides of the greenhouse. We also need to build a wooden frame at one end to contain a door and vent. Once we get this done, we will install an inner hot bed for starting seedlings, low tech insulation on the north side, mass to collect solar heat and even out temperature swings, and possibly a compost heating system. These systems will be backed up by an electric heater.

Advertisements

One thought on “Greenhouse construction, Phase one/ Notes from the meeting of December 3rd

  1. Pingback: Greenhouse Construction Phase Two/ Notes from the Meeting of December 18th | Saint Isidore Society

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s